VIDEOS
LEARN MORE
This video demonstrates how Ram Jack's twin hydraulic cylinders drive steel piling through a guide sleeve and bracket using the weight of your home as a reaction force. The twin cylinders and drivehead allow for longer sections of piling to be used, minimizing connections.
Our interior folding slab bracket minimizes the size of the hole that is drilled in the slab on the interior of your home. Once the bracket is installed and pressure is applied, the bracket unfolds and evenly distributes force along the bottom side of the concrete slab.
Ram Jack's® steel piling lift system utilizes an all-thread and strap system to precisely hold the pile firmly in place without the use of shims or bolts. The strap has a capacity of up to 70 kips (70,000 lbs.).